Projects

Every job with a space of its own

Whitfield HouseFollow
Write an update…Post

Maya Ellis

May 21 · 10:20

3 6

Ryan Cole

May 22 · 10:21

4 14

Folders that arrive ready

Every project opens with Permits, Survey, Construction Documents and more — the structure the practice already uses.

The whole project in one place

Client, deadline, and project type in plain sight. Residential or commercial, active or on hold, the state of the project reads immediately.

0 4

Every revision kept

The current sheet on top, the revision history right below it. Nothing gets lost between one issue and the next.

Tasks

A board that shows what each person is delivering this week

Capture a task in seconds and get back to the drawing

Enter to create a task, assign an owner and a priority without leaving the keyboard, paste a whole list to get started.

What is for later goes to the backlog, without inflating this week’s sprint. When you would rather see the board, switch to the kanban view and drag between columns.

Current sprintFilter: StatusSort: priority
TaskOwnerPriority
1Review the section drawingsMayaHigh
2Update the outline specMayaMedium
3Coordinate the plumbing setMayaMedium
4File the permit applicationMayaLow
5Bring the survey into the modelMayaLow
6Close the Foundry Lane proposalRyanHigh
7Detail the kitchen millworkRyanMedium
8Select the tile packageRyanHigh
9Schedule the site visitChloeMedium
Priority: HighOwner: me

Filters and sorting

Build the view that matches your week, or use the default that ships ready.

PlumbingApprovalClientUrgentHandover

Labels

Tag tasks by discipline, phase, or client and filter the whole board in one click.

Maya E.
Ryan C.

Team workload

See in one place what everyone in the practice has to deliver, across every project.

SCHEDULE

The architecture project, in the vocabulary of architecture

More than 40 project phases already loaded, a schedule that sees the whole year, and a quiet timer that feeds hours back into each project.

Schedule · Whitfield House
90 days▶ 02:18:42 · Maya
MarAprMayJunJulAugSepOctNov
Site survey
Concept design
Permit set · zoning
Construction documents
Consultant coordination
Construction administration

BUILT-IN PROJECT PHASES

edit, reorder, hide — they’re yours

Site surveyPre-briefConcept design3D massing studyProgram of requirementsSchematic designPermit setPlanning approvalFire reviewConstruction documentsMillwork detailingLighting detailingFinishes scheduleConsultant coordinationOutline specificationBid and negotiationContractor selectionConstruction administrationPeriodic site visitsFinal walkthroughOwner’s manualRendering+ 22 more

TIMER · MAYA

Detail the millwork · Whitfield House

02:18:42

started at 1:42 PM · today

38h

this week

164h

on the project

78%

of budget

HOURS THIS MONTH · BY PERSON

156 hours logged

Maya38h
Ryan28h
Chloe14h
Ben22h

EXPORT

CSVPDFby projectby phase

Site visits

The whole site written up before you are back at the office

Site visit

Whitfield House · May 14 · 09:30

In progress

Site photos

Notes

Maya added a note just now

Visit checklist

Check the walls for plumb
Photograph the second-floor slab
Measure the bedroom window opening
Note the outstanding electrical items

Open items created

Review second-floor electrical set→ Task
Request a tile sample→ Task

Built to use on site

On your phone, one hand free and a hard hat in the other. Photo, comment, and checklist item all in the same place.

Open items become tasks

Every checklist item left open becomes a task on the right project, with an owner and a due date.

Review second-floor electrical
Request a tile sample

Project history

The visit history stays with the project. Glance at it and see how the job progressed, visit after visit.

May 14 · Maya
May 2 · Maya
Apr 18 · Ryan